
Energy Ministry confirms damage to 161kV Aboadze–Tarkwa transmission line
[Joy Online - Ghana] - 15/10/2025
The Ministry of Energy and Green Transition has confirmed that the Ghana Grid Company Ltd. (GRIDCo)’s 161kV Aboadze–Tarkwa transmission line has been damaged, potentially affecting power supply in parts of the Western and Ashanti Regions.
... Article published by "Joy Online" (Ghana), read more
For any information or claim on this article, see directly with the newspaper.
In Ghana newspapers
Media General’s Joseph Ackah-Blay, Sixtus Dong Ullo called to the Ghana Bar
Two senior producers at Media General, owners of TV3, 3FM and other subsidiaries have been called to the Ghana Bar (…)
[3news] - 10/10/2025
Malaysia Adopts Landmark Kuala Lumpur Declaration On Climate Resilience As IGEM 2025 Opens, Targeting RM5.5 Billion In Green Investment
KUALA LUMPUR, MALAYSIA – Media OutReach Newswire – 15 October 2025 – Organised by the Ministry of Natural Resources (…)
[Business Day Ghana] - 15/10/2025
King Mohammed VI Urges Greater Social Justice and Territorial Equity in Address to Parliament
News Ghana, Latest Updates and Breaking News of Ghana, Kwabena Adu Koranteng, https://www.newsghana.com.gh/king-mohammed
[News Ghana] - 11/10/2025
EC to conduct by-elections nationwide for vacant Electoral areas and Units
The Electoral Commission of Ghana has announced that it will conduct by-elections across various Electoral Areas and (…)
[3news] - 7/10/2025
As technology evolves, Ghana’s investigative and prosecutorial frameworks must also do same – CID Boss
Director-General of the Criminal Investigative Department (CID), DCOP Lydia Yaako Donkor, has said that (…)
[3news] - 9/10/2025